Amur Gas Processing Plant (AGPP)
Amur Natural Gas Processing Facility (AGPP) will be established by Gazprom on the Chinese border of the Eastern Siberia Region and will be Russia’s largest facility and one of the world’s largest gas processing facilities. At the facility, which will have a production capacity of 42 billion cubic meters per year when completed, valuable components can be processed for petrochemical and other industries besides natural gas. Processed natural gas is planned to be exported to China via the “Power of Siberia” pipeline.
- Yapıfen performed the services of Rusification and preparing construction design documentation in accordance with the Russian standards and specifications of 68 separate buildings from different types, functions and sizes within its scope of the project.
- Some of the structures in our scope were as follows;
– Interconnecting Pipe Rack
– Packaged Transformer Substation
– Control Room
– Switch Room
– Containerized Filling Station
– Basin 211
– Underground Storm Water Tank