
Aşkale Ring Road Bridges
Under Emre Özcan Engineering contract, detail design projects of 5 prestressed girder bridge have been prepared in the scope of project. Information about bridges as follows;
- Tercan Junction Bridge: 2 spans with a total length of 33 m
- East Junction Bridge: 2 spans with a total length of 46 m
- Peripheral Road Junction Bridge: 2 spans with a total length of 46 m
- Karasu-1 Bridge: 3 spans with a total length of 90.3 m
- Karasu-2 Bridge: 7 spans with a total length of 258.4 m