The construction documents for the bridge located on the Reşat Baysal-Aktaş Village Detour Roadway, with 4 spans and maximum span length of 43 meters, and with the total size of 167.2 meters, have been prepared.
PREVIOUS PROJECT
NEXT PROJECT