Boyabat Dam Spillway Bridge has 6 spans and is 75.8 m in total. The bridge is composed of rectangular prestressed beams. Under Emre Özcan Engineering responsibility, design consruction documentation has been prepared.
PREVIOUS PROJECT
NEXT PROJECT