Under Optim Obermeyer Inc. responsibility, within the scope of “Preliminary Design and Construction Documentation Preparation for Various Bridges Job”, the designed bridge has 2 spans with 60 m overall length.
PREVIOUS PROJECT
NEXT PROJECT