Menekşe Bridge

Within the scope of work “Consultancy for the Construction of the Menekşe Bridge Project Located on the Gülnar-Aydıncık Road in Mersin”, the design and construction documentation have been prepared for the balanced bridge type Menekşe Bridge.

  • Considering the terrain and geometrical conditions, a mixed system with post-tensioned concrete deck system type was chosen for Menekşe Bridge.
  • The bridge with a total length of 530 m has 6 spans.
  • The first and last two spans will be constructed with the scaffolding formwork method, and the 380 m part, which is the sum of the 3 spans in the middle, will be constructed with the balanced cantilever method.
  • The maximum span of the bridge is 180 m.
Paylaş:
Project Details
Category Balanced Cantilever Bridges
Year 2018
Client Karayolları Genel Müdürlüğü
Location Mersin - Türkiye

PREVIOUS PROJECT

State Road Bridges Between İzmit and Kandıra

NEXT PROJECT

Preparation of Under/Overpass Design Projects for Level Crossings

yapifen-white-logo
Cookies
We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies.
Accept
Hacklink Hacklink Satış бэклинки casibom casibom güncel giriş