Menekşe Bridge

Within the scope of work “Consultancy for the Construction of the Menekşe Bridge Project Located on the Gülnar-Aydıncık Road in Mersin”, the design and construction documentation have been prepared for the balanced bridge type Menekşe Bridge.

  • Considering the terrain and geometrical conditions, a mixed system with post-tensioned concrete deck system type was chosen for Menekşe Bridge.
  • The bridge with a total length of 530 m has 6 spans.
  • The first and last two spans will be constructed with the scaffolding formwork method, and the 380 m part, which is the sum of the 3 spans in the middle, will be constructed with the balanced cantilever method.
  • The maximum span of the bridge is 180 m.
Paylaş:
Project Details
Category Balanced Cantilever Bridges
Year 2018
Client Karayolları Genel Müdürlüğü
Location Mersin - Türkiye

PREVIOUS PROJECT

State Road Bridges Between İzmit and Kandıra

NEXT PROJECT

Preparation of Under/Overpass Design Projects for Level Crossings

yapifen-white-logo
Cookies
We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies.
Accept