Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. and general designer Teknik Engineering & Emre Özcan Engineering. The bridge has 4 spans with a total length of 148.6 m. The maximum pier height of the bridge is 35 m.