
Terme Junction Overpass Bridge
Within the scope of the project works in which Emre Özcan Engineering is the general designer; design construction projects of multi level junction bridge located on Samsun-Piraziz State Road in Terme District of Samsun, have been prepared.
The superstructure of the bridge with 10 spans and a total length of 266.3 m is formed with 120 cm prestressed beams placed in a separate layout. Transverse beams are used in the middle of each opening and in the support areas.
Totally alluvial ground layers under bridge are reinforced with required and sufficient number of 100 cm diameter DSM (Deep Soil Mix) piles.