Artvin Dam Spillway Bridge

Artvin Dam Spillway Bridge has 7 spans and 125 m in total length. The bridge is formed from prestressed beams of I-150 and I-180 ty...
Continue reading

İsmet İnönü Street Bridge

Under Emre Özcan Engineering contract, within the scope of the work, the designed prestressed girder bridge has 4 spans and 79.4 m ...
Continue reading

Avres Bridge

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. an...
Continue reading

Bez Bridge

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc...
Continue reading

Esenyaka Bridge

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. an...
Continue reading

İnanlı Bridge

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc...
Continue reading

Sinevrat Bridge

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. an...