Okumaya devam et

Artvin Barajı Dolusavak Köprüsü

Artvin Dam Spillway Bridge has 7 spans and 125 m in total length. The bridge is formed from prestressed beams of I-150 and I-180 ty...
Okumaya devam et

İsmet İnönü Caddesi Köprüsü

Under Emre Özcan Engineering contract, within the scope of the work, the designed prestressed girder bridge has 4 spans and 79.4 m ...
Okumaya devam et

Avres Köprüsü

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. an...
Okumaya devam et

Bez Köprüsü

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc...
Okumaya devam et

Esenyaka Köprüsü

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. an...
Okumaya devam et

İnanlı Köprüsü

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc...
Okumaya devam et

Sinevrat Köprüsü

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. an...
YAPIFEN TR WHITE
Çerezler
Web sitemizdeki deneyiminizi geliştirmek için çerezleri kullanıyoruz. Bu web sitesine göz atarak, çerez kullanımımızı kabul etmiş olursunuz.
Kabul Et