Okumaya devam et Torbalı-Bayındır Yolu Arıkbaşı DDY Köprüsü Design construction documentation of the bridge with one span and a total length of 35.5 m on the Torbalı-Bayındır Road were prepar...
Okumaya devam et Bayındır-Ödemiş Yolu Bayındır DDY Köprüsü Design construction documentation of the bridge with 3 spans and a total length of 64.5 m on the Bayındır-Ödemiş Road were prepared...
Okumaya devam et Manisa-Akhisar Yolu Saruhanlı DDY Üstgeçit Köprüsü Design construction documentation of the bridge with 2 spans and a total length of 61.25 m on the Manisa-Akhisar Road have been pre...
Okumaya devam et Salihli-Kula Yolu Taytan Köprüsü Implementation projects of the 3-span prestressed girder bridge with a total length of 74.2 m on the Salihli-Kula Road have been pr...
Okumaya devam et Boyabat Barajı Dolusavak Köprüsü Boyabat Dam Spillway Bridge has 6 spans and is 75.8 m in total. The bridge is composed of rectangular prestressed beams. Under Emre...
Okumaya devam et Havuzlu Viyadüğü Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc...
Okumaya devam et Kömürlü Viyadüğü Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. an...
Okumaya devam et Karayolları 4. Bölge Muhtelif Yaya Üst Geçit Projeleri Within the scope of the work, typical design construction documentation projects of 4 prestressed pedestrian overpass bridges have...
Okumaya devam et Nevit Kodallı Üstgeçit Köprüsü Under Emre Özcan Engineering responsibilty, the prestressed girder bridge designed within the scope of "Mediterranean Games Stadium...
Okumaya devam et Stadyum Kavşağı Köprüsü Under Emre Özcan Engineering responsibilty, the prestressed girder bridge designed within the scope of "Mediterranean Games Stadium Hig...