Continue reading

Arıkbaşı Railroad Bridge

Design construction documentation of the bridge with one span and a total length of 35.5 m on the Torbalı-Bayındır Road were prepar...
Continue reading

Bayındır Railroad Bridge

Design construction documentation of the bridge with 3 spans and a total length of 64.5 m on the Bayındır-Ödemiş Road were prepared...
Continue reading

Saruhanlı Railroad Overpass Bridge

Design construction documentation of the bridge with 2 spans and a total length of 61.25 m on the Manisa-Akhisar Road have been pre...
Continue reading

Taytan Bridge on Salihli-Kula Road

Implementation projects of the 3-span prestressed girder bridge with a total length of 74.2 m on the Salihli-Kula Road have been pr...
Continue reading

Boyabat Dam Spillway Bridge

Boyabat Dam Spillway Bridge has 6 spans and is 75.8 m in total. The bridge is composed of rectangular prestressed beams. Under Emre...
Continue reading

Havuzlu Viaduct

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc...
Continue reading

Kömürlü Viaduct

Bridge design construction projects were prepared within the scope of the work carried out by the contractor Doğuş Construction Inc. an...
Continue reading

Nevit Kodallı Bridge

Under Emre Özcan Engineering responsibilty, the prestressed girder bridge designed within the scope of "Mediterranean Games Stadium...
Continue reading

Stadium Junction Bridge

Under Emre Özcan Engineering responsibilty, the prestressed girder bridge designed within the scope of "Mediterranean Games Stadium Hig...
yapifen-white-logo
Cookies
We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies.
Accept